桥梁钢模板施工注意事项,如何控制和减少钢模板安装过程中的失误?
9 月 25, 2024
使用钢模板浇筑混凝土前有哪些注意事项?
9 月 25, 2024在公路桥梁施工中,组装和拆卸钢模板时,如果作业高度超过 2 米,应按照高空作业的要求进行施工。
The switching power supply of lighting tools and other electrical equipment required in the construction process should have good insulation performance. At the same time, the switching power supply and distribution lines should not be immediately placed on the 钢模板. Cable sheaths should be used to separate them, and the cable sheaths should be checked immediately to ensure that they are intact.

During evening construction, there must be sufficient lighting fixtures, and the working standard voltage of the lighting fixtures cannot exceed 36V. If the natural environment for construction is damp and cold, or unnecessary temperatures are encountered, the working voltage should be below 12V.
When dismantling steel formwork, if the height is less than 3m, steel bar stools need to be used for construction work. If the height exceeds 3M, steel scaffolding or work platforms must be erected, and protective nets must be raised at the same time.
Small safety guardrails should be installed in the pre embedded holes of steel formwork, elevators, and other places.
In the hidden turning process of steel formwork, if necessary, it should be stopped halfway, and the already in place steel formwork should be tightened to solve the problem. It cannot be left idle at will.
In the assembly and disassembly process of 钢模板, the formwork cannot be avoided arbitrarily, and it is best not to deposit more than three layers of formwork in scaffolding or work platforms. The total load formed by stacking steel formwork, prefabricated steel formwork components, and operators shall not exceed the main allowable load during the design of scaffolding or construction platforms.