Pansol standard heavy-duty bridge traveler applied on Jinan Fenghuang Road Yellow River Bridge. High strength, modular design, safe & efficient for long-span overwater bridge construction in Yellow River Basin.
In the construction of bridge engineering, before pouring the concrete, the internal structure of the steel formwork should be checked for dirt. If there is any, it should be dealt with in a timely manner to ensure that the surface of the formwork is clean.
At the beginning of its establishment, Pansol established a technical service team led by the factory director himself. Up to now, the team has expanded to more than 50 people, has traveled a total of 100,000 kilometers, and served thousands of engineering projects.