The Stenmeiden Step Hydroelectric Power Station is located at the junction of Cambodia’s Koh Kong Province and Thailand’s Khao Yai Province, the project area is located in the northwestern part of the capital of Koh Kong Province and in the middle reaches of the Stenmeiden River in Cambodia, and it is developed in three levels, with a total installed capacity of 150MW. the hydroelectric power stations are composed of a concrete gate and dam, intake, diversion culverts, diversion tunnels, regulating wells, pressure pipelines, and above-ground plant buildings.

PANSHI Heavy Industry’s provision of gate pier formwork for the project fully reflects the project constructor’s affirmation and trust in our technical capability and performance ability, marking an important step in the cooperation between the two sides in the hydropower field, and further enhancing PANSHI Heavy Industry’s brand influence in the overseas hydropower market. Upon completion, the project will provide Cambodia with sufficient and stable clean energy and promote local economic development.
Since PANSHI products entered the Southeast Asian market in 2019, it has always adhered to the principle of mutual benefit and win-win, given full play to its own advantages in the hydropower field of “heavy design, low price, high quality, honesty and trustworthiness”, and cooperated with the project constructor, handing over one after another cost-effective engineering works, which has been widely recognized and praised by people both inside and outside the industry. PANSHI Heavy Industry will continue to make greater contribution to the social development and people’s welfare of Southeast Asian countries by exerting its own advantages and brand influence.