Pansol steel formwork solves the construction dilemma of Huaihe River Bridge – see how professional formwork system reshapes the paradigm of bridge construction.
As a key project for the navigation upgrade of the Huaihe River Basin, the bridge needs to complete the construction of 42 spans of cast-in-place structures before the flood season, involving eight types of steel formwork systems such as cap beams and pile-tied beams.